• :::
  • Back to Home

  • 網站地圖
  • 中

  • A

  • 分享
  • 搜尋

Default Logo

  • About RB
    • Leader
      • Director General of RB
    • Organization
      • Organization & Functions
      • Policies and Certification
  • Railway Construction
    • Project Management
      • Progress of Projects
    • Railway Infrastructure Development
      • Under Planning
      • Under Construction
      • Major Construction Projects Completed in Recent Years
    • Railway Elevation and Undergrounding Projects
      • Under Planning
      • Under Construction
      • Major Construction Projects Completed in Recent Years
  • Railway Business
    • Operation Supervision
      • Supervision regulations
      • Safety
      • Inspection
    • Railway Industry
      • Industry Policies
      • Action Plan
    • Station Development
      • Taiwan High Speed Rail
      • Taoyuan Airport MRT
      • Sinking Fund
      • Investment Services
  • Publications
    • Laws and Regulations
    • Integrity Platform
      • Launching Ceremony
      • Contact Meeting
:::
Home
Railway Construction
Railway Infrastructure Development
Major Construction Projects Completed in Recent Years
HSR Project

  

Taiwan High Speed Rail(HSR) Project


Along with the development of economy, the rapid growth on transportation needs and increasing values of time has led the trend to construct high-speed rails in many countries worldwide. In Taiwan, the mileage between major cities is all within 400 kilometers. When various transport systems appear to be saturated, it is the best time to develop the high-speed transport system. As a result, our government has started aggressively to promote the High Speed Rail Project.


The line of Taiwan HSR is about 350 km in length with 12 stations along it, including Nangang, Taipei, Bangiao, Taoyuan, Hsinchu, Miaoli, Taichung, Changhua, Yunlin, Chiayi, Tainan and Kaohsiung. The average distance between these stations is about 32 km. Three stabling yards are established in Hsichih (汐止, Taipei), Wujih (烏日, Taichung) and Tsoying (左營, Kaohsiung) for trains overnight parking, cleaning and preparation. In addition, a main workshop is set up in Yentsao (燕巢, Kaohsiung); a depot is built in Hsichih and two civil/electrical engineering maintenance bases are founded in Liuchia (六家, Hsinchu) and Taipao (太保, Chiayi).


投影片1.JPG

The first stage of  the operation , eight station of the high speedrail was operated in May 2, 2007, namely, Taipei, Banqiao, Taoyuan , Hsinchu, Taichung, Chiayi , Tainan, and Kaohsiung. and by 2010 four more station was open, i.e.Naugang, Miaoli, Changhua and Yunlin. The speed on HSR is designed as 350 km per hour. Trains are designed with headway of four minutes in peak hours. The travel time is 90 minutes from Taipei to Kaohsiung, shortening 150 minutes. It is about one third or one fourth of the time needed by the existing narrow-gauge railway trains or the highway- running cars. Each HSR train has 989 seats and the line has a capacity of 300,000 seats per day, making its traffic capacity 30 times the air transportation, 4 times the narrow-gauge railway and 2.5 times the freeway.


The HSR has turned out to be the key mode of transportation in the Taiwan western corridor. It will also connect with the metropolitan MRT systems and the existing railway to shape a high-efficiency rail transit network, and to restrain the growth of private car ownership, and alleviate traffic congestion in highways and parking problems in urban areas.


Taiwan government encouraged private enterprises to participate this project in BOT mode. As a result, the Taiwan High Speed Rail Corporation (THSRC) signed the Taiwan High Speed Rail Construction and Operation Contract and Station Area Development Contract with Ministry of Transportation and Communications (MOTC) on July 23, 1998. The THSRC was thus officially authorized with a 35-year concession of HSR construction and operation and a 50-year concession of station specific zone developments. For financial arrangement, MOTC and THSRC agree to extend the concession of HSR construction and operation to 70 years and stop the concession of station specific zone development ,in July 27, 2015. 


The project was estimated to cost $16.5 billion U.S. dollars. The items committed by the government will cost $3.4 billion U.S. dollars accounting for 20.6% of the total cost. Private investment will be $13.1 billion U.S. dollars accounting for 79.4% of the total cost. Items committed by the government include land acquisition, planning, design, supervision and civil work for understructures in Taipei sections. Private investment includes civil works, stations, track work, electrical and mechanical system, maintenance bases, and financial cost. To share the benefits with government, the THSRC promises to appropriate parts of yearly earnings to government for HSR further development and construction.

Publish Date:

108-09-11

Maintenance Unit:

Operation Supervision Division

Last Update Date:

115-01-23

< Back
Thank you for using this service. Your satisfaction is our motivation. We welcome you to fill out the satisfaction feedback form for the presentation of this webpage. Your valuable feedback will help us improve our service quality.
*How many points do you give to the presentation of this webpage?
Please click the stars above to provide a rating

Your suggestions for the presentation of this webpage:※ Limit to 1000 characters
If you have any suggestions or areas that need improvement for TRA services, please leave a message at the "Director's Mailbox", and we will handle it carefully as soon as possible.
*Verification codeverification code  
  
:::
  • About RB
    • Leader
    • Organization
  • Railway Construction
    • Project Management
    • Railway Infrastructure Development
    • Railway Elevation and Undergrounding Projects
  • Railway Business
    • Operation Supervision
    • Railway Industry
    • Station Development
  • Publications
    • Laws and Regulations
    • Integrity Platform
  • Privacy Policy  |
  • Information Security Policy  |
  • Open Announcement

Emergency Contact: During Office Hours: (02)8072-3333 | After Hours or Holidays: (02)8969-1601 Railway Bureau, MOTC All Rights Reserved | Tel: (02)8072-3333 | Fax: (02)8969-1600 Address: 9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan (R.O.C.)

Ethics Hotline: (02)8969-1540 | Ethics Fax: (02)8969-1539 | Ethics Mailbox: New Taipei City Government Post Office Box 18

Ethics Email: invx@rb.gov.tw Recommended browsers: Chrome, Edge, Safari, Firefox. Screen resolution: 1280 X 810 or higher.


Search
Facebook
YouTube
  • Facebook
  • YouTube