Main Content TOP

Railway Bureau, MOTCLOGORailway Bureau, MOTC

  • :::
  • Sitemap
  • 中文版

Site Search

Engineering Technology  Environmental protection  public art | Advance Search
  • About RB
    • Director General of RB
    • Organizational Outline
  • Railway Construction
    • Railway Construction
    • HSR Planning
    • TIAA MRT PROJECT
    • TWWB MRT Project
    • Taichung Project
    • Kaohsiung Project
    • Hualien-Taitung Line Electrification Project
    • Hualien-Taitung Efficiency Improvement Project
    • South-Link Line Railway Electrification Project
    • Tainan Project
    • Airport MRT Extension Line Project
    • Airport MRT Adding Airport Terminal 3 Station (A14
    • Taiwan Railway Fengming Temporary Station Construc
    • Taiwan Railway Pingzhen Temporary Station Construc
    • Taoyuan Metropolitan Area Railway Underground Proj
    • Elevated Railway Project at the Urban Area of Chia
    • Taiwan Railway Station Aesthetics and Functional I
    • Double-track electrification of railways in Huadon
  • Project Management
    • Progress of project
  • Operation Supervision
    • Operation Supervision
    • Periodic inspection
    • Railway Safety Voluntary Reporting Information Sys
  • Railway Industry
    • Railway Industry
    • Implementation Measures of Railway Industry Develp
    • Testing and Certification System
  • Station Development
    • Station Development
    • Contact information
    • Available land areas for investment
  • Laws and Regulations
    • Laws and Regulations
    • Directions
  • Public Art
    • TIAA MRT System Public Art
    • The Beauty Of The High Speed Rail Stations
    • Taiwan Railway Stations Public Art
    • Railway Architecture – Cultural Heritage
    • Railway Architecture – Modernism
    • Railway Architecture – Integration of Arts
    • Railway Architecture – Local Characteristics
    • Take the Train - Slow Traveling
  • Publications
    • Artistic Conceptions of Stations
    • The Hub for Journey and the Way Home
    • The Dragon Gallops Underground
    • Jacanas and the Floating Leaves
  • Multimedia
    • Videos
    • Photo Gallery - Stations
    • Photo Gallery - Facilities
  1. :::You are here
  2. Home
  3. Laws and Regulations
  4. Directions
Friendly printing logo Forwarding sharing logo Facebook logo Line logo

 Laws and Regulations

Directions

2022-01-11     0
  • Directions for the Lease of the Remaining Lands for Building Acquired by Zone Expropriation of High Speed Rail Project Implemented by MOTC
  • Directions for the Sale of the Remaining Lands for Building Acquired by Zone Expropriation of High Speed Rail Project Implemented by MOTC

 

 

 

Publisher:Railway Bureau, MOTC
URL:https://www.rb.gov.tw/en/showpage.php?lmenuid=96&smenuid=343
Update time: 2022-05-11 17:19:00
Back

Below the declared area

:::
About RB
  • Director General of RB
  • Organizational Outline
Railway Construction
  • Railway Construction
  • HSR Planning
  • TIAA MRT PROJECT
  • Kaohsiung Project
  • South-Link Line Railway Electrification Project
  • Tainan Project
  • Airport MRT Extension Line Project
  • Airport MRT Adding Airport Terminal 3 Station (A14
  • Taiwan Railway Fengming Temporary Station Construc
  • Taiwan Railway Pingzhen Temporary Station Construc
  • Taoyuan Metropolitan Area Railway Underground Proj
  • Elevated Railway Project at the Urban Area of Chia
  • Taiwan Railway Station Aesthetics and Functional I
  • Double-track electrification of railways in Huadon
Project Management
  • Progress of project
Operation Supervision
  • Operation Supervision
  • Periodic inspection
  • Railway Safety Voluntary Reporting Information Sys
Railway Industry
  • Railway Industry
  • Implementation Measures of Railway Industry Develp
  • Testing and Certification System
Station Development
  • Station Development
  • Contact information
  • Available land areas for investment
Laws and Regulations
  • Laws and Regulations
  • Directions
Publications
  • Artistic Conceptions of Stations
  • The Hub for Journey and the Way Home
  • The Dragon Gallops Underground
  • Jacanas and the Floating Leaves
Back to top
  • Privacy Policy
  • Government Website Open Information Announcement
Bureau of High Speed Rail, MOTC (logo)

Railway Bureau, MOTC
9F., No.7, Sec. 2, Xianmin Blvd., Banqiao Dist., New Taipei City 220231, Taiwan, R.O.C.
TEL : +886-2-8072-3333 FAX : +886-2-8969-1567
Best viewed with Internet Explorer 11, Chrome, FireFox or higher with 1024 x 768 resolution.  

Republic of China (Taiwan) Government Entry Point  Web accessibility
 
Visits: 338,363