progress of project
2021/4/30
Item | Project | Scheduled Progress | Actual Progress |
---|---|---|---|
1 | the Additional TIAA MRT Airport Terminal 3 Station (A14) Project | 20.21% | 20.30% |
2 | TIAA MRT Extension Line Project | 60.87% | 61.86% |
3 | Taichung Metropolitan Area Elevated Railway Project | 100% | 100% |
4 | Chiayi Urban District Elevated Railway Project | 31.02% | 31.06% |
5 | Tainan Urban District Railway Underground Project | 51.66% | 51.64% |
6 | Kaohsiung Urban Railway Underground Project (included Zuoying and Fengshan Project) | 90.78% | 90.78% |
7 | South-Link Line Railway Electrification Project | 98.81% | 98.81% |
8 | TRA Fengming Temporary Station Project | 31.61% | 33.05% |
9 | TRA Pingzhen Temporary Station Project | 12.30% | 12.30% |
10 | Taoyuan Urban District Railway Underground Project | 1.88% | 1.88% |
11 | Hualien-Taitung Line Dual-Track Engineering Project | 3.83% | 3.83% |